Contractor Specifications & Production Requirements
The following is a list of requirements that the contractor will need to full-fill for The 678 Tribute Orchestra show production, and sub-contract and/or hire companies to provide what is necessary for a performance:
SHOW REQUIREMENTS (Downloads):
1. Ryder (PDF)
2. Stage Plots:
37-Piece Plot (PDF)
25-Piece Plot with Choir (PDF)
19-Piece without Strings/Choir (PDF)
3. Input Lists:
37-Piece (PDF)
25-Piece (PDF)
19-Piece (PDF)
|